141 research outputs found

    Inhibitors to optimal project portfolio selection

    Get PDF
    The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance

    Quality management system and construction performance

    Get PDF
    This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs

    Critical factors for successful housing reconstruction projects following a major disaster

    Get PDF
    Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects

    Profiles of organisational culture in Indonesian construction companies

    Get PDF
    Although relatively few studies have been undertaken analyzing the drivers of performance for construction companies in producing and delivering satisfactory quality of project works, findings from previous research reveal that there is a significant correlation between the company’s organisational culture and the quality performance of contractors. It has also been noted that the nature of organisational culture is a major determinant factor for quality improvement. This paper presents a summary of the results of a pilot study investigating the organisational culture profiles of five Indonesian construction companies. The survey utilizes the Organisational Culture Assessment Instrument (OCAI), which is based on the Competing Values Framework (CVF). This instrument assesses six important and significant traits of organisational culture: dominant characteristics, organisational leadership, management of employees, organisational ‘glue’, strategic emphasis, and criteria of success. These assessed cultural dimensions identify the most close-fitting perspective of a company’s inherent culture drawn from four possible types: clan, adhocracy, market, or hierarchy culture. Further discussion is presented, which describes the companies’ dominant cultural profiles in terms of strength and congruence and how an effective quality management system operates within the dominant culture type. This analysis contributes to the finding that a suitably ‘strong’ organisational culture impacts positively on construction organisation success within its own specific sector

    The impact of organisational culture on project selection: What is the appropriate culture type?

    Get PDF
    Project selection is a complex decision making process that is not merely influenced by the technical aspects of the project. Selection of road infrastructure projects in the Indonesian public sector is generally conducted at an organisational level, which involves multiple objectives, constraints and stakeholders. Hence, a deeper understanding of the various organisational drivers that impact on such decisions, in particular organisational culture, is much needed for improving decision-making processes as it has been posited by some researchers that organisational culture can become either an enabler, or a barrier, to the process. One part of the cultural assessment undertaken as part of the research, identifies and analyses the cultural types of relevant and involved organisations in the decision making process. The organisational culture assessment instrument (OCAI) of Cameron and Quinn (2011) was utilized in this study and the data was taken from three selected provinces in Indonesia. The results can facilitate the surveyed (and similar) organisations to improve their performance by moving towards a more appropriate cultural typology that is arguably better suited to their operations and to improving their organisational processes to more closely align with their organisational vision, mission and objectives

    Organisational culture in airworthiness management programs: Developing a measurement model

    Get PDF
    All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs

    Uncovering the impact of organisational culture types on the willingness to share knowledge between projects

    Get PDF
    Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context

    Extending constructability concept to include operation and maintenance issues

    Get PDF
    The concept of constructability uses integration art of individual functions through a valuable and timely construction inputs into planning and design development stages. It results in significant savings in cost and time needed to finalize infrastructure projects. However, available constructability principles, developed by CII Australia (1993), do not cover Operation and Maintenance (O&M) phases of projects, whilst major cost and time in multifaceted infrastructure projects are spent in post-occupancy stages. This paper discusses the need to extend the constructability concept by examining current O&M issues in the provision of multifaceted building projects. It highlights available O&M problems and shortcomings of building projects, as well as their causes and reasons in different categories. This initial categorization is an efficient start point for testing probable present O&M issues in various cases of complex infrastructure building projects. This preliminary categorization serve as a benchmark to develop an extended constructability model that considers the whole project life cycle phases rather than a specific phase. It anticipates that the development of an extended constructability model can reduce significant number of reworks, mistakes, extra costs and time wasted during delivery stages of multifaceted building projects

    The role of trust in inter-projet knowledge transfer

    Get PDF
    Knowledge is a powerful organisational asset yet intangible and hard to manage, particularly in a project environment where there is a tendency to repeat the same mistakes rather than learn from previous project lessons. A lack of effective knowledge sharing across projects causes reinventions that are costly, and time consuming. Research on knowledge transfer has focused mainly on functional organisations and only recent attention has been directed towards knowledge transfer in projects. Furthermore, there is little evidence in the literature which examines trust in the knowledge transfer processes. This paper studies how the three types of trust - ability, benevolence, and integrity impact on knowledge transfer from the inter-project perspective. Three case studies investigated the matter. A detailed description of the work undertaken and an analysis of interviews with project professionals from large project-based organisations are presented in this paper. The key finding identifies the positive impact of ability trust on knowledge transfer. However, it was also found that perception on both integrity and benevolence varied across organisations suggesting that there can be a possible impact of organisational factors on the way trust is perceived in inter-project knowledge transfer. The paper concludes with a discussion and recommendations regarding the development of trust for inter-project environment

    Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects

    Get PDF
    Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects
    • …
    corecore